Farrans appointed to construct new London Stansted skylinks

London Stansted has today confirmed Farrans as its partner for the construction of the airport’s new skylink walkways. The new skylinks are an integral feature of the airport’s transformation programme, creating new walkways to directly connect the terminal to existing satellite buildings that are home to the departure and arrival gates. The addition of the […]

The interior of an airport with passengers walking with their suitcases along the corridor from the escalator

Aug 10, 2026

London Stansted has today confirmed Farrans as its partner for the construction of the airport’s new skylink walkways.

The new skylinks are an integral feature of the airport’s transformation programme, creating new walkways to directly connect the terminal to existing satellite buildings that are home to the departure and arrival gates.

The addition of the skylinks will enable Stansted’s track transit people mover system to be decommissioned, creating the space for the terminal building to be extended towards the airfield in later phases of the transformation work.

The centrepiece of the programme is a three-bay extension to the existing terminal that will transform the customer experience. It adds 16,500m2 of space, creating a bright spacious environment with new shops, bars and restaurants, making Stansted the biggest single terminal airport in Europe.

The skylinks will feature passenger travelators and allow for assistance buggies to take passengers with reduced mobility on the full journey between the terminal and the arrival and departure gates.

Work will begin later this summer with pre-assembly of skylink sections taking place ‘offsite’ in a vacant airport hangar on the northside of the airfield.

This method of construction will save time, and by reducing working at height, creates a safer working environment, as well as reducing congestion in busy airport operational areas

Once each section is completed, they will be transported overnight from the construction hangar across the airfield on self-propelled modular transporters (SPMTs) to minimise disruption to the airport’s operation.

Rob Stewart, MAG’s Capital Delivery Programme Director, said:

“We’re delighted to continue our strong and successful partnership with Farrans at London Stansted having successfully worked with the team through the design, planning and enabling phases of the skylinks project, a vital component in our overall transformation programme.

“We now move to the construction phase of the work, where Farran’s expertise and experience of delivering airport projects in busy operational environments will be invaluable.

“The airport continues to welcome record numbers of passengers so together with our delivery partners we are really building momentum on our transformation programme that will deliver new passenger facilities, support growth and unlock capacity on our existing single runway.

Glenn Gilmore, Regional Director at Farrans, said:

“Passengers arriving to London Stansted will already be able to see that we are mobilising our site in preparation for main works to begin during this exciting period of transformation for the airport.

“Construction in aviation environments comes with many unique challenges including making sure that our clients’ business operations can continue 24/7 with minimal disruption every day. We are specialists in managing these tricky interfaces with our extensive experience on site at numerous other UK airports.

“We will be collaborating closely with our clients and their operations team as we deliver this important project to support passenger number growth at London Stansted.”

Sponsored Advert

Related Posts

Aerial view of an early-stage housing development, with cleared earth and groundworks among green fields, next to an existing housing estate and a main road.
Plasdŵr spine road works progress

Edenstone and Codi Group have released aerial photography showing progress on the main spine road into Porth yr Awen, part of Plasdŵr in Cardiff. The joint venture plans 184 homes on the £55m scheme, and Edenstone expects construction of the homes to begin in early 2027. Plasdŵr is planned as a 900-acre neighbourhood of around 7,000 homes, and the scheme includes 57 affordable homes.

A grassy field with patches of cut, dried grass in front of a dense line of green trees, including silver birch, under a partly cloudy sky.
Henry Boot issues profit warning

Henry Boot has warned that its full-year 2026 results will be significantly below market expectations, with an underlying loss before tax of £0m to £10m, according to Construction Enquirer. The property and land group also expects exceptional items of £40m to £45m, is in talks with lenders over banking covenants, and plans to present a new strategy in March 2027.

Computer-generated image of a large three-storey red-brick building in Georgian style, with pediments, a white colonnaded porch, and brick piers and railings along the front.
Wyatt Homes plans 75 Blandford homes

Wyatt Homes has submitted a reserved matters planning application to Dorset Council for the second phase of Lancaster Gate in Blandford Forum. The proposals cover 75 homes, a local centre with a convenience shop and community hall, relocated allotments and land safeguarded for a primary school, with 30% of homes affordable. Phase one, of 150 homes, is under construction.