NHBC Foundation publishes new research on the effects of changing climate on the construction sector after record breaking summer temperatures
The latest NHBC Foundation report, produced in partnership with Studio Partington, Managing construction in a changing climate, considers the effects of a changing climate on the construction sector both now and in the future. This new research explores the impact of climate and weather hazards on the built environment and construction projects, and the steps the […]

Aug 4, 2026
The latest NHBC Foundation report, produced in partnership with Studio Partington, Managing construction in a changing climate, considers the effects of a changing climate on the construction sector both now and in the future. This new research explores the impact of climate and weather hazards on the built environment and construction projects, and the steps the wider industry must take to mitigate risk to quality and delivery. With recent record-high temperatures, this report is a timely reminder for the industry to consider the impact of climate change on construction.
Construction has always been susceptible to adverse weather conditions, with extremes and seasonal patterns affecting delivery. Today however the industry faces accelerating climate change with sweltering heat, intense rainfall, powerful storms and prolonged dry spells proving increasingly common. These shifts present profound challenges for the built environment and for those who design, construct and maintain it.
This new publication from the NHBC Foundation provides clear, practical guidance at a time when construction professionals must reconsider long-held assumptions about predictability, seasonality and site safety. As weather patterns become more volatile, the construction industry must strengthen its ability not only to respond to these changes, but to anticipate and adapt to them.
Managing construction in a changing climate draws together the latest climate science, real world construction impacts and insights from experts across industry, academia and safety bodies. It highlights that resilience within the construction process is no longer an optional consideration but a commercial and operational imperative. If the industry fails to prepare and adapt to the evolving climate, it will face delays, material failure, insurance losses, increased build costs, compromised quality and risks to worker welfare. Conditions and scenarios explored in this report are not limited to just extreme heat but also:
- Cold waves
- Dust storms
- Flooding
- Fog
- High winds
- Storms
- Torrential rain
Richard Smith, Head of Standards, Innovation & Research at NHBC commented: “While construction projects have always been susceptible to weather fluctuations, historically, the industry has been able to rely on predictable weather cycles for scheduling and planning. In a changing climate however this approach is no longer viable, with the unpredictability of weather events already proving to be a growing challenge. The recent record-breaking scorching temperatures we’ve seen are evidence of this, with May, June and July proving far hotter than any of us expected. This report encourages the industry to consider how to continue delivering high quality homes year-round while mitigating operational and commercial risk.
Related Posts
Plasdŵr spine road works progress
Edenstone and Codi Group have released aerial photography showing progress on the main spine road into Porth yr Awen, part of Plasdŵr in Cardiff. The joint venture plans 184 homes on the £55m scheme, and Edenstone expects construction of the homes to begin in early 2027. Plasdŵr is planned as a 900-acre neighbourhood of around 7,000 homes, and the scheme includes 57 affordable homes.
Henry Boot issues profit warning
Henry Boot has warned that its full-year 2026 results will be significantly below market expectations, with an underlying loss before tax of £0m to £10m, according to Construction Enquirer. The property and land group also expects exceptional items of £40m to £45m, is in talks with lenders over banking covenants, and plans to present a new strategy in March 2027.
Wyatt Homes plans 75 Blandford homes
Wyatt Homes has submitted a reserved matters planning application to Dorset Council for the second phase of Lancaster Gate in Blandford Forum. The proposals cover 75 homes, a local centre with a convenience shop and community hall, relocated allotments and land safeguarded for a primary school, with 30% of homes affordable. Phase one, of 150 homes, is under construction.