London Bridge station rebuild earns top CEEQUAL score
Region & Route: Southern South East The rebuilding of London Bridge station has been awarded top marks in the prestigious CEEQUAL scheme. The £1bn project, delivered as part of the government sponsored Thameslink Programme, received a 97.3 per cent CEEQUAL score. CEEQUAL is the evidence-based sustainability assessment, rating and awards scheme for civil engineering, infrastructure, landscaping […]

Jul 15, 2019
- Region & Route:
- Southern
- South East
The rebuilding of London Bridge station has been awarded top marks in the prestigious CEEQUAL scheme.
The £1bn project, delivered as part of the government sponsored Thameslink Programme, received a 97.3 per cent CEEQUAL score.
CEEQUAL is the evidence-based sustainability assessment, rating and awards scheme for civil engineering, infrastructure, landscaping and public realm project. The scheme operates alongside BREEAM – bringing together the world’s leading sustainability assessment methods for buildings, master planning, and infrastructure.
London Bridge station is central London’s oldest station and the fourth busiest in the UK. The Thameslink Programme required the station to be rebuilt, while remaining open for the 55 million passengers a year who use it.
Sustainability was a driving factor throughout the design and construction phases of the redevelopment project.
Andy Barnes, consents manager, Thameslink Programme, London Bridge station re-development said: “We are very proud to have achieved such a high score. It is testament to the importance which was place on sustainability across all elements of the project. It also demonstrates the hard work and commitment of everyone involved to deliver not just a great building but provide a blue print for delivery of major complex projects.”
Ian Nicholson, director, CEEQUAL and infrastructure BRE said: “It gives us great pleasure to present the London Bridge team with their CEEQUAL Excellent certificate. They have demonstrated a very high level of sustainability performance in the rebuilding and remodelling of the station. Their performance shows how it is possible to deliver high performance without costing more money.”
Examples of how the sustainability agenda and successes have made the London Bridge project stand out include:
- Practices led to construction carbon savings of 1,687 tCO2e, embodied carbon savings of 8,354 tCO2e and annual operation carbon savings of 396 tCO2e
- Construction phase sustainability initiatives saved £1.3 million with a payback of just six months
- Operational phase sustainability initiatives saved £115k annually
- Installation of a geothermal energy pile system contributed 6.1% carbon savings
- Re-use of 5,000 m2 of aggregates and diversion of over 98% of waste from landfill
- Providing work experience for over 30 students, training to over 200 unemployed residents and 61 apprenticeships
- Delivering several community improvement projects and 35 engagement events
- Supporting the sustainability agenda by producing 52 sustainability focused best practice case studies to highlight how the project provided solutions and improvements to improve overall sustainability performance, both regarding the environment and to strengthen links with the local community
- Other elements of the Thameslink Programme which have received CEEQUAL awards include: Borough Viaduct, Bermondsey Dive Under, Blackfriars and Farringdon stations.
Notes to Editors
Photo left to right: Nick Martin, Thameslink Programme, London Bridge station project manager, Costain ; Ian Nicholson, CEEQUAL; Isabel Simpson,TLP, LBS, Costain, CEEQUAL assessor; Ben Joiner, TLP, LBS, Network Rail project manager; Andy Barnes, Network Rail, consents manager
Related Posts
ISUZU UK Gives An ‘Electrifying’ Round Of Applause For ‘Masters Of The Universe’, Released In UK Cinemas On 5th June
MASTERS OF THE UNIVERSE is a new live-action feature film from Amazon MGM Studios and Mattel Studios, based on the iconic franchise Isuzu UK in-dealership and social media collaboration with MASTERS OF THE UNIVERSE highlights the power and performance of the new Isuzu...
Firecrest Construction Completes 40 Bed Care Home For Exemplar Health Care
Firecrest Construction has successfully completed the complex delivery of a new 40 bed care home in Bury town centre for Exemplar Health Care. As principal contractor to the scheme, Firecrest delivered the job on budget and on time, handing over after 64 weeks...
The Hill Group Achieves Hat Trick of Planning Successes Across the South East
Award-winning housebuilder The Hill Group has secured a hat trick of planning permissions across the South East, marking a significant milestone in the delivery of much-needed new homes across the region. Across three newly approved schemes in Essex, Oxfordshire and...



