Anglian Water’s @one Alliance progresses £1.7m water main reinforcement to support Daventry’s growth
Introduction Daventry, a market town and civil parish in West Northamptonshire, England, is experiencing continued development, with significant housing growth planned across the area. As new developments increase demand on the existing water network, additional infrastructure is required to provide capacity for future properties while maintaining the resilience of the wider distribution network. As part […]

Oct 2, 2026
Introduction
Daventry, a market town and civil parish in West Northamptonshire, England, is experiencing continued development, with significant housing growth planned across the area. As new developments increase demand on the existing water network, additional infrastructure is required to provide capacity for future properties while maintaining the resilience of the wider distribution network.
As part of this investment, Anglian Water’s @one Alliance was tasked by Anglian Water to deliver a £1.7m water main reinforcement scheme to support planned growth in the Monksmoor area of Daventry.
The project involves installing approximately 1.5km of new 355mm outside diameter high-performance polyethylene (HPPE) water main, together with connections to the existing network. The scheme has been designed around a 50-year planning horizon and has involved detailed hydraulic modelling, route development and consideration of local construction constraints.
The project is nearing completion in late 2026, with the new infrastructure providing additional capacity within the network to support current and planned development.
The issue
The Monksmoor development includes approximately just under 5,000 new homes planned in the wider area. As more properties connect to the water network, demand will increase, requiring additional capacity to support planned growth in and around Monksmoor, Daventry.
Network monitoring had already identified lower water pressure at a key point in the area. Without additional investment, this could reduce further as the number of properties and demand for water increased.
The challenge was therefore to provide the required capacity while finding a practical route for the new infrastructure with as little disruption as possible.
Hydraulic modelling was used to assess the capacity required for new developments and the reinforcement’s interaction with the wider Daventry distribution zone. An initial route through a field was explored to minimise disruption to local customers, but investigations found this option to be unviable. The team subsequently developed a route incorporating highway, verge and footway sections.
Further modelling identified that 548m of the proposed main should increase from 280mm to 355mm outside diameter to accommodate wider growth, including development around Micklewell Park to the north and Staverton to the south.
The solution
The final solution comprises approximately 1.5km of new HPPE water main, installed predominantly by open-cut construction. The main section consists of 355mm outside diameter HPPE pipe, with sections installed through verges, highway areas, footways and made ground.
The scope included:
• 340m of 355mm outside diameter HPPE installed in the verge
• 198m of 355mm HPPE through a Type 2 highway open-cut section
• 705m of 355mm HPPE through made verge and footway
• 211m of 280mm HPPE through a Type 2 highway open-cut section
• Three connections into the existing water network
• An isolation valve and washout arrangement
• Associated sluice valves and washouts to support future operation of the network
The new main connects into the existing network at three locations. Connection A uses an existing service valve and washout arrangement on Admirals Way to connect into the existing 280mm polyethylene main. Connections B and C involve cut-in tees to the existing 12-inch PVC main. These connections include 300mm sluice valves and 80mm washouts, providing the necessary arrangements for isolation and future network operation.
The design was developed using hydraulic modelling to assess the required pipe parameters and understand the impact of the reinforcement on the wider distribution network. A Modelling Technical Specialist reviewed the water main parameters and confirmed that the proposed arrangement would not detrimentally affect the required distribution flows.
The reinforcement also supports the ring-main structure of the Daventry distribution zone, allowing it to form part of the wider network rather than being considered solely in relation to the immediate development. The design has been developed in accordance with the Manual of Water Distribution, with hydraulic requirements informed by network modelling.
Soil sampling was undertaken as part of the design process. The results did not identify a requirement for barrier pipe, allowing the specified HPPE solution to be progressed.
The design also provides operational flexibility. Where agreed, future flows can be managed through a three-way arrangement, allowing each leg to be isolated and flushed to a suitable point from the isolated section.
Keeping customers informed.
With construction taking place along Admirals Way and Eastern Way, customer communication has been an integral part of the project.
Letters, email updates and targeted social media advertising have kept residents informed about progress, traffic management and what to expect as work continues. The project team is also active in local Facebook community groups, sharing regular updates and responding directly to residents’ questions.
Together, these communications have achieved a combined reach of nearly 100,000, helping keep the wider community informed alongside those directly affected by the works.
Benefits of the solution
The £1.7m investment provides additional capacity within the Daventry water distribution network, supporting planned residential growth in Monksmoor and the wider area. The reinforcement has also been designed to account for wider growth within the Daventry distribution zone, including development around Micklewell Park and Staverton.
Careful route planning and design development enabled the project team to identify a practical alignment for the new main, taking account of local access, existing utilities, vegetation and the surrounding environment. This helped the team develop a solution that could be delivered effectively while considering the needs of local customers and the wider community.
The final route also supports a practical construction approach, with the majority of the new main installed using open-cut methods. The completed infrastructure includes connections, valves and washouts, providing flexibility for the future operation and maintenance of the network.
Conclusion
The £1.7m scheme will provide additional network capacity to support continued growth in Daventry, while strengthening resilience for the wider distribution network. Careful planning and collaboration with the local community and supply chain have helped us deliver the work while managing disruption.
Once complete, the new infrastructure will provide additional capacity for planned development across Monksmoor and the wider area, while supporting the future operation and resilience of the local water network. The project demonstrates how considered design and collaborative delivery can support growth while taking account of the needs of local customers and communities.
Related Posts
G F Tomlinson completes state-of-the-art Clinical Training Centre for University of Nottingham
Midlands contractor, G F Tomlinson, has successfully developed the University of Nottingham’s new Clinical Training Centre (CTC), delivering a cutting-edge facility that will provide immersive teaching environments for the next generation of healthcare professionals....
McLaren Construction appointed to deliver regional distribution centre for Waitrose and DHL in Avonmouth
McLaren Construction Midlands & North has been appointed to deliver a multi-million-pound warehouse redevelopment and logistics project at MountPark 360 in Avonmouth on behalf of the Waitrose and DHL Supply Chain. The scheme will transform an existing warehouse,...
New Forest District Council advises housing tenants on additional rights under Awaab’s Law
New Forest District Council (NFDC) is reminding housing tenants about important new legal protections that come into force on 30 November under the next phase of Awaab's Law. Originally introduced in October 2025, Awaab's Law focused on ensuring landlords took prompt...